Search This Blog

Wednesday, July 20, 2011

Instant Concrete Road Repair Solution



Instant Concrete road repair solution
By Mr Mangesh Dhamele
Dy. Manager. Choksey Structural Engineering
INTRODUCTION
The Durability of road structures depends on the quality of its maintenance & minor renovations. Maintenance keeps the roadway safe, provides good driving conditions & prolongs the life of the pavement, thus protecting the road investment.
Currently, in India more than 2000 km of concrete road is in the operation since the last few years. Most of the projects completed by NHAI, MSRDC and other state government authorities. Though the quality & procedural aspects, specifications/guidelines clearly mentions in IRC, MoRTH, but still we observe that various minor cracks, potholes and joints edge spalling in the PQC due to various factors which requires maintenance. Maintenance includes the prompt sealing of cracks & filling of potholes to prevent water from entering through the surface.
Repairs and rehabilitation of concrete roads are required to have a smooth riding quality as well as avoid inconvenience causing to the vehicles. We need to have a durable repair product to avoid of cost of various factors like :
a) Diverting the traffic for repairs
b) Inconvenience to the traffic
c) Repeatedly cost of repairs by using conventional methods.
REQUIREMENT OF THE PRODUCT FOR REPAIRS OF CONCRETE SURFACE
1) Resistant to abrasion and weather conditions.
2) Skid resistance, non-reflective finish with colour matching with concrete
3) Fast setting so that repaired patch can accept traffic in as little as one hour.
4) Resistance to deicing chemicals & various industrial chemicals
5) Jet fuel and other fuel resistance like petrol, diesel, oil and grease.
6) A good bond between concrete and steel, Impermeable.
7) Flexible enough to accommodate anticipated expansion and contraction.
8 ) Ultra-violet Resistance, User friendly and paintable.
9) Manufacturer of the material should have a good track record & experience in such kind of repair products.
10) Economical
CONVENTIONAL METHODS OF REPAIR CONCRETE STRUCTURES
Though we have developed our specifications and guidelines to lay the PQC up to the international standards, now considering the deteriorating conditions of the concrete roads, we have to develop the good specifications and proper guidelines/application systems to repair and rehabilitation of concrete surfaces permanently.
Currently following are the various conventional methods we are using for the repairs of the concrete road.
1) Repair by fast setting water based cement compound
2) Repair by epoxy mortar, which is non-UV Resistance material.
3) Repairs of PQC by laying bituminous concrete or bitumen in the cracks & potholes.
4) Other conventional methods
NEXT GENERATION FAST SETTING COMPOUND DELPATCH
In 1983, The D.S. Brown Company introduced DelcreteTM Elastomeric Concrete. The rigid, yet flexible connection DelcreteTMprovided between steel and concrete soon made it the premier solution for bridge and highway spall repair as a permanent repair solution for high performance pavements, which would offer minimum downtime and, at the same time, limit exposure of work crews to traffic.
D.S. Brown engineers formulated DelpatchTM Elastomeric Concrete from the original DelcreteTM product. DelpatchTM a new generation of elastomeric concrete has two main uses. First, it is an excellent patching material for cracks and spalls on airport runways and highways. Second, Delpatch TM provides an easy to use solution in retrofitting airport runways with lighting & bridges with expansion joints.
Delpatch vs Others
DescriptionEpoxy based MaterialCementatious MaterialDelpatch – Polyurathan Based Material
  • Technical properties:
Compressive Strength60 N/mm2Max 55 N/mm2 in 28 days time.80 N/mm2 in one days
Flextural Strength20 N/mm25.5-
Tensile Strength10 N/mm2-13.44 N/mm2
Impact resistancePoorpoorvery good Impact resistance
FlexiblePoorpoorIt can deflect up to 10%, and will regain its original shape
Abrasion resistanceYesUp to some extentvery good abrasion resistance.
  • Practicle:
CuringDoesn’t required curing by waterCuring by water is must, otherwise it develops cracksDoesn’t required curing by water
Time required to allow traffic6 – 16 hours12 – 24 hoursAfter one hour
PaintableYesYesYes
UV resistancePoorgoodVery good
Water impermeabilityGoodpoorVery good
  • Economy :
Rate per ltr or Kgs.Initial cost will be cheaper,Cheaper than epoxyInitial cost will be slightly higher
Life cycle costWill be high as need to repair frequentlyWill be too high as need to repair frequentlyLife cycle cost will be cheaper

A. Existing condition before repair:
After construction of PQC, various cracks has developed due to various reasons like
a) Settlement of the sub-base
b) Surface cracks due to high wind-velocity during laying of PQC
c) Late initial cut of PQC
We have found that various major potholes, cracks and joint spalling at various junctions of Jogeshwari Vikhroli Link Road, Mumbai and at Mumbai international airport wherein contractor or government authorities are unable to repair by epoxy, as epoxies are not UV Resistant or by cementatious material and also they are unable to hold the traffic for conventional repairs.
Following are the few photographs shows deteriorating concrete surfaces and cracks, which requires repair on priority basis to avoid further damage to take place.
Conclusions:
We can conclude with the recommendation of Delpatch should be the material which can be used for such kind of repairs which are critical and important.
This material can be used for following repairs and rehabilitations of:
  1. Concrete roads & patches including underpasses
  2. Expressways, aprons of airports, where we can not hold the traffic for the sake of repairs of the deterioted patches
  3. Nosing wheel areas, where the loads expected more than 150 – 200 tonnes per 2 sq.ft. Area
  4. Replacing the expansion joints – which we can complete in one night, actually such kind of practices adopted in US, and other part of the world, where replacement of expansion joint is essential but at the same time, contractor does not have the permission to hold the traffic for longer time.
  5. Heavy Industrial floors, shop floors.
  6. Light conduits to put lights on the runways.
  7. All the surfaces exposed to the sunlight.
  8. A top surface of spillways, bucket area of Dams, where water pressure is more, & surface is exposed to sunlight.

No comments: